blogs  
 
yournews
   
 
Video Photos Finance Travel Weather Discussion TV Shows
| |
 
  Home ›
 
Singapore News

 

Stages 1 & 2 of Circle Line to open in first half of 2010
By Asha Popatlal, Channel NewsAsia | Posted: 30 August 2009 2018 hrs

  Commuters ready to board the MRT train in Singapore. (file pic)
 
Photos  of

   
 


SINGAPORE: The next phase of the Circle Line – Stages 1 and 2 – will start operations in the first half of 2010. Transport Minister Raymond Lim revealed this at a dialogue session in Bukit Panjang on Sunday.

Its exact opening date, however, will only be finalised after engineers complete the necessary tests.

The first five stations on the Circle Line opened for service on May 28. Even though ridership has not been as high as initially projected on the 5.7-kilometre stretch, this could change with the opening of 11 new stations next year.

Stage 1 of the Circle Line starts from Dhoby Ghaut, through MRT stations like Esplanade and Nicoll Highway, and ends at Stadium, while Stage 2 starts from Mountbatten, through interchange station Paya Lebar, and ends at Tai Seng.

The other 13 stations from Marymount to Harbourfront will be ready by 2011. Daily ridership of this 33.3-kilometre line is estimated to be close to half a million when it is fully operational.

As for buses, the Land Transport Authority (LTA), which is taking over the role of central bus network planner from the end of the year, will consult grassroots leaders islandwide on how to improve the bus network from next month.

Mr Lim said: "Rather than do a major overhaul of the existing system which may actually lead to people being worse off, (we want to) get a feel of how residents want this because really, there is no right or wrong answer here. Different people have different needs and want it done differently."

LTA hopes to complete this consultation exercise by end-March next year.

A Bukit Panjang resident, whose child has to endure long bus rides to school, said: "Because there are no direct buses, it takes three hours of travelling time, to and fro, from our constituency to Nanyang Technological University."

Another resident has a grouse on the location of a new MRT station which is to be built in Bukit Panjang as part of the new Downtown Line.

"All of us are very happy about that, but the location isn't very convenient because it's not linked to the LRT and is far away from the interchange," he said.

Responding to this, Mr Lim said there are technical constraints in the area, but the LTA is looking for a better solution.

What Bukit Panjang's grassroots leaders hope to achieve in their talks with the LTA is to move the bus interchange from its current premises closer to the new MRT station of the Downtown Line.

This would then link all three transport nodes – MRT, LRT and buses – within a 70-metre radius. Currently, the proposed new MRT station is 120 metres away from the bus interchange.


- CNA/so

 


Other singapore News
Govt to build 10 more family centres to bring help closer
Rehabilitation medicine to play bigger role
Costs a worry if employers' CPF rate raised
SMRT extends inquiries deadline to March
GE results due to economic issues, says Shanmugam
S'pore should try to up construction productivity: Khaw
Continuous improvements in education system needed: Education Minister
Singaporeans supportive of climate change actions
40 firefighters tackle fire at Riverside Road factory
MOE introduces new component in lower secondary humanities subjects
9 NMPs formally appointed
Educate public on need for social services: Chan Chun Sing
Police coast guards present patrol boats to Indonesian counterparts
2 Bedok hawker centres to be upgraded
Body found under CTE flyover
Man arrested for impersonating cop
Police bust illegal gambling den
43-year-old man jailed for having sex with minor
2 young women found dead at Changi chalet
Chinese national charged after "kicking policeman in groin"
Fire at Riverside Road factory under control

 

 
Affiliate Sites:
 
About Us  |  Contact Us  |  Advertise with Us  |  Terms & Conditions