Johor Bahru-Singapore RTS Link passes 65% construction milestone on both sides; connecting span complete | Video
03:10 Min
Construction of the 4km Johor Bahru-Singapore Rapid Transit System (RTS) Link has crossed another milestone, with roughly 65 per cent of structural works on the Singapore side done.
11 Jan 2024 10:26pm
Construction of the 4km Johor Bahru-Singapore Rapid Transit System (RTS) Link has crossed another milestone, with roughly 65 per cent of structural works on the Singapore side done.